Guide 30 · The builder
How to Vet a North Texas Builder: Reputation, Warranty and Inspections
Texas does not license home builders, so a builder's reputation is verified one record at a time: BBB and court records, corporate standing, finished communities, and references, plus the written warranty and the builder warranty inspections tied to it, from pre-pour through the first-year warranty review.
Vetting a North Texas builder is different from vetting a licensed contractor, because there is no state home-builder license to check. The Texas Residential Construction Commission, the agency that once registered builders, was abolished in 2009, and no state license replaced it; the trades inside the home are licensed separately, but the company that builds the home is not. That makes vetting a records check, a references check, and a contract check at once, and this guide walks all three, including the Texas six-year warranty and the builder warranty inspections that turn a written warranty into a working one.
Why Texas has no builder license to check
The Texas Residential Construction Commission registered builders and ran a mandatory warranty plan until the legislature abolished it through the 2009 sunset review, with the agency closing in 2010, and no state agency has replaced it. What Texas licenses instead: electricians and heating and air conditioning contractors under the Texas Department of Licensing and Regulation, plumbers under the State Board of Plumbing Examiners, and contractors registered by individual cities for work within their limits. The entity behind your contract is not on any statewide list, so take the company name from the purchase agreement, not from the sales center sign, and check the entity itself.
The four records worth pulling on any builder
The Better Business Bureau publishes complaint histories for Texas builders, and the volume of complaints in the last 12 to 36 months, plus whether they were resolved, matters more than the letter grade. County civil court records show whether the builder has been sued over construction defects, a different and more specific signal than a single dispute. The county permitting office and the Texas Attorney General's consumer protection division hold complaint and citation trails worth a search. And the Texas Comptroller's franchise tax records show whether the corporate entity is in good standing: a forfeiture of registration means the company has lost its right to transact business in Texas until it catches up.
Membership in the local home builders association signals an active, established builder, and local associations also run homebuyer dispute resolution programs that some builders agree to use before litigation. None of these checks guarantees a smooth build, but together they separate the builders whose warranty claims process has been tested from the ones who have never had to answer for one.
Red flags to watch in the sales center and the paperwork
A few patterns deserve extra scrutiny. A sales center that quotes incentives verbally but will not put them in writing, or ties them to a lender selection that changes the math. A contract that offers no written warranty at all: under HB 2024 the absence of a qualifying written warranty simply keeps the older ten-year statute of repose, and it also means there are no written terms describing what is covered, what is excluded, or how to claim. A builder who discourages third-party inspections, or schedules no inspection windows outside the final walkthrough. A deposit demand that jumps ahead of the staged schedule in the contract, or a deadline that requires signing today to hold the price or the lot. And any builder who cannot produce the warranty document, the written price breakdown, or references from homes completed one to three years ago.
The Texas 6-year warranty and how to read it
House Bill 2024, effective June 9, 2023, amended Section 16.009 of the Texas Civil Practice and Remedies Code, the statute of repose for residential construction claims. The old rule allowed construction-defect claims up to 10 years after substantial completion. The new rule sets a 6-year window for new detached single-family homes and townhomes up to three stories, but only when the builder provides a written warranty with at least 1 year on workmanship and materials, 2 years on the plumbing, electrical, and heating and air conditioning delivery systems, and 6 years on major structural components. A builder who provides no qualifying written warranty stays under the older 10-year window.
Read the warranty as a contract, because the exclusions are where coverage ends: site preparation and soils, grading and drainage, landscaping, and cosmetic settling are typically outside it. Read the claims process: who to notify, the written-notice requirement, the builder's cure window under the Residential Construction Liability Act (Texas Property Code Chapter 27), and whether the warranty transfers if you sell. The inspections and warranty chapter reads the structure and the cure process in full.
The 10-year to 6-year change, explained
Texas used to hold builders to a 10-year statute of repose for residential construction: the outside limit for pursuing latent structural defects after substantial completion was a full decade. House Bill 2024, effective June 9, 2023, cut build-era warranty liability to 6 years for new detached single-family homes and townhomes up to three stories, but only when the builder provides a qualifying written 1-2-6 warranty: at least 1 year on workmanship and materials, 2 years on the plumbing, electrical, and HVAC systems, and 6 years on major structural components. The change was builder-friendly: in exchange for providing that written warranty, the builder's exposure to latent-defect claims drops from 10 years to 6.
The 10-year default still applies in two situations. If the builder provides no qualifying written 1-2-6 warranty, the older 10-year statute of repose remains in place. And contracts signed before June 9, 2023 keep the 10-year rule, because the law applies to work that begins after the effective date, not to homes already under contract before it. For buyers, that makes the warranty a written question, not a memory test: confirm in writing, before you sign, whether the home carries a 1-2-6 warranty, because it changes how long you have to pursue structural issues, from 10 years down to 6.
Builder warranty inspections: the four dates that make the warranty real
The inspections tied to a new build run on the builder's construction calendar first, and then on yours. During construction, the two one-time looks are pre-pour, before the slab hides the footings, rebar, vapor barrier, and under-slab plumbing, and pre-drywall, after framing and rough-in but before the walls close, the stage inspectors describe as the single most valuable inspection of a new build. Both deserve your own third-party inspector, and both deserve you or a trusted representative on site.
After closing, the warranty's 1-year workmanship and materials tier carries its own inspection date: the first-year warranty review, commonly scheduled in month 10 or 11 after closing so there is time to submit a written repair list before the tier lapses. Wait for at least one full seasonal cycle if you can, walk with a checklist, photograph and date every finding, and submit the list in writing. Builders rarely remind homeowners this date exists, so it is the homeowner's to put on the calendar.
- Pre-pour (during construction). Footings, rebar, vapor barrier, and under-slab plumbing, checked before the concrete hides them. Cannot be redone afterward.
- Pre-drywall (during construction). Framing and rough-in checked before the walls close: the single most valuable inspection stage, and the one worth a flight for an out-of-state buyer.
- Final walkthrough (at closing). A punch-list meeting against the finish list in the contract, with your inspector's earlier findings in hand.
- First-year warranty review (month 10 to 11 after closing). After at least one full seasonal cycle, document drywall cracks, sticking doors, trim gaps, and drainage issues, and submit the repair list in writing before the 1-year tier expires.
References and the finished-community walk
Ask for references from homes completed one to three years ago, not from last quarter's closings, because the warranty years are when a builder's real responsiveness shows. Call the references and ask the two questions that matter: what broke in the first year or two, and how long did the builder take to fix it, in writing, without a fight. Then walk a finished community and look at homes built two and three years ago: grading around the foundations, driveways and sidewalks, and how the homes settled.
Between the records, the references, and the contract, vetting a builder is a week of homework, not a day, and it is the cheapest insurance on the largest purchase you will make. Once a builder passes the vet, the next step is the question list: what the base includes, what upgrades add, the warranty exclusions, and the contract terms, all in the questions-to-ask chapter.
Sources
Material factual claims in this guide link to the sources below. Market figures are reported conditions, not guarantees; verify current offers in writing.
- Texas Sunset Advisory Commission: Texas Residential Construction Commission agency history
- BBB complaint history example: First Texas Homes
- Texas Comptroller: franchise tax forfeiture notices
- Texas Attorney General: file a consumer complaint
- Fee Smith: Reduced statute of repose for residential construction (HB 2024)
- Justia: Texas Property Code, Title 4, Chapter 27 (Residential Construction Liability Act)
- Chicago Home Inspector: your 11-month builder warranty inspection
- National Home Inspection Authority: one-year warranty inspection for new construction
- Chase: new construction and new builds, home phase inspections
Continue on InDFWLiving.com
Compare North Texas areas and new construction
This site is the process. For the places, the area guides, communities, and current new-construction inventory live on InDFWLiving.com.
About this guide
The NewBuildNTX buying process
NewBuildNTX is the process-first guide to buying new construction in North Texas, written for out-of-state and in-state buyers alike. Every chapter is sourced, reviewed, and kept current.
Next in the process
Your next step
Run your builder background check before you sign
Bring the builder you are considering, and get the record checked: BBB and court history, corporate standing, the written warranty, and the inspection plan tied to it, before you put money down.
NewBuildNTX | North Texas new-construction buying guide